Page 94 from: Recycling International May/June issue 2023

? ?
LME Non-Ferrous Prices & Stocks Reference date: May 1, 2023
/ Aluminium / Copper
– LME prices (in U.S. dollars/MT)
– LME stocks (x 1000 metric tonnes)
– LME prices (in U.S. dollars/MT)
– LME stocks (x 1000 metric tonnes)
/ Lead / Zinc
– LME prices (in U.S. dollars/MT)
– LME stocks (x 1000 metric tonnes)
– LME prices (in U.S. dollars/MT)
– LME stocks (x 1000 metric tonnes)
M A M J J A S O N D J M A
3984 3090 2900 2500 2458 2305 2102 2237 2315 2361 2630 2336 2301
584 584 381 381 309 309 577 577 415 415 415 570 570
1000
1500
2000
2500
3000
3500
4000
0
1000
2000
3000
4000
5000
6000
M A M J J A S O N D J M A
M A M J J A S O N D J M A
10420 9910 9500 8500 7710 7702 7353 7510 7966 8345 9345 9047 8465
137 137 125 125 103 103 93 93 73 73 73 62 62
4000
5000
6000
7000
8000
9000
10000
0
100
200
300
400
500
M A M J J A S O N D J M A
M A M J J A S O N D J M A
2400 2363 2200 2000 2013 1890 1753 1986 2163 2281 2198 2182 2122
40 40 39,6 39,6 37 37 27 27 20 20 20 32 32
0
500
1000
1500
2000
2500
3000
0
70
140
210
280
350
M A M J J A S O N D J M A
M A M J J A S O N D J M A
4054 4218 3800 3400 3115 3144 2810 2714 2974 3025 3508 2957 2765
1017 1017 815 815 773 773 441 441 176 176 176 533 533
1000
1500
2000
2500
3000
3500
4000
4500
100
500
900
1300
1700
2100
2500
2900
M A M J J A S O N D J M A
94
MARKET ANALYSIS
cant and complementary footprint in
Philadelphia.’
AURUBIS PARTNERSHIP
Aurubis and manufacturer SMS group
have signed a supply contract for a sec-
ond plant module for the new recycling
plant at Richmond in the US state of
Georgia. The additional equipment will
increase the capacity from an annual 90
000 tonnes of complex metal scrap
materials to 180 000 tonnes. The core
SMS technology, a top-blown rotary
converter, processes complex recycling
materials to recover copper, nickel, tin,
precious metals and platinum group
metals. The overall project is costing
EUR 640 million and will result in the
first secondary smelter specialising in
multi-metal recycling in the US.
Groundbreaking for Aurubis Richmond
took place in mid-2022 and the first
stage of the plant is scheduled to go
online in the first half of 2024.
STENA FIRST
Stena Recycling Group has completed
construction of its first recycling facili-
ty for lithium-ion batteries, one of the
first at industry scale in Europe. The
new plant has an initial yearly recy-
cling capacity of 10 000 tonnes and
will handle material collected and pre-
treated in Stena Recycling’s existing
facilities and processes in Sweden,
Denmark, Poland, Finland, Norway,
Germany and in Italy.
Meanwhile, Recycler Recyclus has been
given final clearance by the regulatory
authorities to operate the first such
plant in the UK with the capacity to
recycle lithium-ion batteries on an
industrial scale. The company hopes the
Wolverhampton facility will mean an
increase in its battery recycling capacity
from an estimated 8 300 tonnes in the
first full year of operations to more than
41 000 tonnes by 2027.
ALUMINIUM
High grade was last listed at US$ 2
388.50 per tonne on the London
Metal Exchange, and alloy at US$ 2
007. Stocks in the warehouses of the
LME were 571 400 tonnes of high
grade and, unchanged, 1 920 tonnes
of alloy. Alloys in Europe fetch up to
US$ 3 760 for 226, US$ 3 850 for 231
and US$ 3 950 for 233.
On a dollar basis, scrap prices have
been noticeably higher than recently.
However, the relatively high value of the
US dollar against the Euro also plays a
role. In Euros, scrap remained more
moderate for the European market.
Extrusions scrap sold for approximate-
ly US$ 2 530 while mixed cast scrap
with iron attachments sold for approx-
imately US$ 1 804. Mixed turnings
retailed for US$ 1 177.
COPPER
The red metal failed to break through
the US$ 9 000 per tonne mark in
Exactly what you are looking for?
Give us a call: +49 211 2105 0
or send us an e-mail:
[email protected]
Distinct Advantages
→ Optimum added value:
maximized main shredder throughput
→ More efficiency:
improved overall production rates
throughout shredding and separation process
→ Lower operating costs:
extended life of shredder system components
and consumables
→ High throughput performance:
up to 110 t/h
→ Lindemann Quality:
longevity, high-value, efficient
PRE-SHREDDER
NEEDED? EtaRip 250
Discover the
LINDEMANN EtaRip!
Check out our new website!
www.lindemann-metalrecycling.com
92-93-94-95_manon-ferrous.indd 94 03-05-2023 17:08